Why Solar Legato?
*May vary depending on inverter manufacturer and equipment configuration.
Yingli Green Energy Japan | WEST HOLDINGS | XSOL |
SMA Japan | Canadian Solar Japan | Qcells |
clean venture 21 | Sungrow Japan | SANSHA ELECTRIC MANUFACTURING |
Suntech Power Japan | SANYO DENKI | GS Yuasa
(GS YourSignfra Systems(formerly Sanken Electric) incl.) |
JA SOLAR JAPAN | Shindengen Electric Manufacturing | SolarEdge Technologies JAPAN |
SOLAR FRONTIER | Diamond&Zebra Electric | DMM.com |
DELTA ELECTRONICS (JAPAN) | TMEIC | Trina Solar Japan |
Nissin Electric | Japan Energy Holdings | Next Energy & Resources |
NEMY | Panasonic SANYO Electric | Hitachi Industrial Equipment Systems |
Huawei Technologies Japan | fujisaki electric | FUJI ELECTRIC |
MARICI Japan(Former:ABB) | Mitsubishi Electric | MEIDENSHA |
YASKAWA Electric |
EDISON POWER | CONNEXX SYSTEMS | GS Yuasa (GS YourSignfra Systems (formerly Sanken Electric) incl.) |
Sumitomo Electric Industries | Chint | Tesla |
DELTA ELECTRONICS(JAPAN) | Toshiba IT & Control Systems | NITTO KOGYO |
Huawei Japan | Murata Manufacturing | MEIDENSHA |
YAMABISHI |
※Please inquire for the model number.
*1 year for Solar Legato match/stand alone
*In case of contract extension, warranty will be continued.
This system has been patented (Patent No. 6364567) as a power generation control system that automatically controls the output of the inverter using an output command value calculated by a unique formula. The system automatically controls the inverter in accordance with fluctuations in power consumption, reducing the risk of reverse power flow and enabling effective use of power generated and maximization of power generated, which was previously excessively suppressed.
Inverter pickup control
※Some inverters may not be eligible. Please contact us for details.
To a control method with high enough speed to inhibit RPR activation.
Unique algorithm for high-speed control in 1-second increments
The communication load has been reduced by our unique “inverter pickup control” algorithm, which controls a limited number of inverters, and the time lag associated with control has been greatly improved from the conventional 6-second cycle to 1-second cycle* measurement and control by changing to measure only power consumption at high speed.
Enables control of recharge/discharge of storage batteries for optimal control of the entire system.
It supports operations with less power purchase and enables more effective use of generated power.
The system is controlled by output command values (%) calculated from the relationship between power generated, power consumed, and storage battery empty capacity to optimize power generation.
When recharging storage batteries
When storage battery is discharged
Based on the calculated rechargeable power, the maximum output power is determined, and the inverter is commanded to generate power and the storage batteries are commanded to recharge, respectively.
Based on the calculated dischargeable power, the maximum output power is determined, and the inverter is commanded to generate power and the storage batteries are commanded to discharge power, respectively.
Priority charging
Specify a time period and command the storage batteries to charge the generated power regardless of power consumption or power generation.
Priority Discharge
Specify a time period or threshold value and command the storage batteries to forcibly discharge.
Maintenance of residual quantity
The minimum remaining capacity of the storage battery is specified in %, and discharge is controlled to the extent that it does not fall below this level.
Local display screen for private consumption
The Solar Link ZERO T5's HDMI output enables direct connection to a display for hassle-free and cost-effective local viewing.(Paid) Local display of self-consumption items and storage battery information according to Solar Legato's measurements is possible.※
Measurement screen
Graph screen
Contact Us