L・eye Photovoltaic power generation Lineup Comparison Chart

To the package overview page

Low voltage Line-up comparison tableAs of February 2025

○ Standard   △ Optional (paid)  
Low voltage (less than 50kW)
Plan name Low voltage Standard Low voltage Salt damage Low voltage SPD Low voltage FL
Measurement target Inverter Inverter Inverter Inverter
Storage board Type B Type G Type B2 Type A Type F
Communication lines  
Solar Radiation and Temperature Sensor
FLIPLINK addition ※1 ※1 ※2
Low Voltage Smart Meter ※3 ※3 ※3
High Voltage Smart Meter
Solar radiation diagnosis ※4 ※4 ※4 ※4 ※4
Output Ratio Diagnosis
Aging Analysis
Power Generation Shutdown Diagnosis
System Diagram
Camera Image ※5 ※5
Service provision period※6
1 year/10 years
On-site Adjustment
Security Option ※7 ※7 ※7

*1 Only FLIPLINK (for measuring solar radiation and temperature) can be added.
*2 Only one unit is free, the second unit will incur a fee.
*3 A dedicated Wi-SUN dongle is added to communicate with the low-voltage smart meter. In addition, customers must obtain an ID and password from their power company.
*4 Solar radiation and temperature measurements are required for solar radiation diagnosis.
*5 Provided in the retrofit configuration "Standard Type".
*6 The provision periods for ASP services, wireless communication services, and equipment warranties are the same as the service provision periods.
*7 Other contact measurements cannot be made with FLIPLINK DI.


Page top

High voltage Line-up comparison tableAs of February 2025

○ Standard  △ Optional (paid)  RTE=Receiving and Transforming Equipment※1  SRTS=Solar Radiation and Temperature Sensor
High voltage1
(50kW or more, but less than 250kW)
High voltage2
(250kW or more, but less than 500kW)
High voltage3
(500kW or more, but less than 1MW)
High voltage4
(1MW or more, but less than 2MW)
Plan name High voltage1
Standard
High voltage1
Salt damage
High voltage1
SPD
High voltage1
FL
High voltage1
Power receiving
and transforming
High voltage2
Light
High voltage2
standard
High voltage2
standard
Boxless
High voltage2
Solar radiation
and temperature
High voltage2
Power receiving
and transforming
High voltage3
Standard
High voltage3
Standard
Boxless
High voltage3
Power receiving
and transforming
High voltage4
Standard
High voltage4
Standard
Boxless
High voltage4
Power receiving
and transforming
Measurement target Inverter Inverter Inverter Inverter Inverter Inverter
SRTS・RTE
Inverter Inverter Inverter Inverter
SRTS
Inverter Inverter
SRTS・RTE
Inverter Inverter Inverter Inverter
SRTS・RTE
Inverter Inverter Inverter Inverter
SRTS・RTE
Storage board Type B Type G Type B2 Type A Type F Type C Type D Type B Type C Type E Type F Type C Type D Type C Type E Type C Type D Type C Type E Type C Type D
Communication lines 
Solar Radiation and Temperature Sensor
FLIPLINK addition ※2 ※2 ※3 ※3 ※4 ※2 ※2 ※2※3 ※3 ※4 ※2 ※2 ※3 ※4 ※2 ※2 ※3 ※4
High Voltage Smart Meter
Solar radiation diagnosis ※5 ※5 ※5 ※5 ※5 ※5 ※5 ※5 ※5 ※5 ※5 ※5 ※5 ※5 ※5 ※5
Output Ratio Diagnosis
Aging Analysis
Power Generation Shutdown Diagnosis
System Diagram
Camera Image ※6 ※6 ※7 ※7 ※7
Service provision period※8
1 year/10 years
On-site Adjustment
Security Option ※9 ※9 ※9 ※9 ※9 ※9※10 ※9 ※9 ※9※10 ※9 ※9※10

*1 FLIPLINK DI, used for measuring substation equipment, supports non-voltage contacts and pulse inputs, while FLIPLINK AI supports 4-20mA/1-5V analog signals.
*2 Only FLIPLINK (for measuring solar radiation and temperature) can be added.
*3 Only one unit is free, the second unit is charged.
*4 Up to two units are free (first FLIPLINK ST), and each additional unit is charged.
*5 Solar radiation diagnosis requires solar radiation and temperature measurement.
*6 Provided in the retrofit configuration "Standard Type".
*7 If FLIPLINK is added, the retrofit configuration "Standard Type" or "Lite Type" will be provided.
*8 The provision period of ASP service, wireless communication service, and equipment warranty is the same as the service provision period.
*9 Other contact measurements cannot be made with FLIPLINK DI.
*10 If the camera image option is installed, the "Standard Type" will be provided.

Storage board list

○ Standard △ Optional (paid)
power supply Contents
Power supply unit AC adapter Breaker Terminal Blocks UPS OA Tap Power SPD RS-485 SPD / LAN SPD HUB FLIPLINK
Type A 100V / 200V
Type B / B2 100V / 200V
Type C 100V
Type D 100V
Type E 100V
Type F 100V / 200V
Type G 100V

*Please prepare a separate power supply for the HUB.


Page Top

Extra High Lineup Comparison TableAs of February 2025

○ Standard  △ Optional (paid)  RTE=Receiving and Transforming Equipment※1  SRTS=Solar Radiation and Temperature Sensor  
Extra high (2MW or more, less than 10MW)
release date TBA
Extra high (10MW or more)
release date TBA
Plan name Extra high10M Standard Extra high voltage over 10M Standard
Measurement target Inverter・RTE・SRTS Inverter・RTE・SRTS
Storage board
(model)
To Be Determined To Be Determined
Communication lines  
Solar Radiation and Temperature Sensor
FLIPLINK addition
Solar radiation diagnosis
Output Ratio Diagnosis
Aging Analysis
Power Generation Shutdown Diagnosis
System diagram
Service provision period※2
1 year/10 years
On-site adjustment
Security options

*1 FLIPLINK DI, used when measuring substation equipment, supports non-voltage contacts and pulse inputs, while FLIPLINK AI supports 4-20mA/1-5V analog signals.
*2 The provision periods for ASP services, wireless communication services, and equipment warranties are subject to the service provision period.


Page Top